|
PVC Pipe &
PVC Trunking
Download Catalog:  Product Links:
NEW PRODUCTS:
|
|
HD PVC TUKL
|
|
| |
More… |
|
| Advantage |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1. Smooth corners and edges that will not abrade wiring or irritate hands. |
| 2. Integrated nonskid liners and unique cover designs insures the ductcover will not slide once installed or during vibration. |
| 3. Specially formulated lead-free PVC material meet the lame retardant requirement. |
|
|
|
|
|
|
|
|
|
| Specification |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Material: |
PVC |
|
|
Fireproofing Grade: |
FV-0;FH-1 |
|
| Color: |
White / Yellow / Grey |
|
Work Temperature: |
-40℃ to 80℃ |
|
|
|
|
|
|
|
|
| Details |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Item NO. |
Size |
Packing (pcs/CTN) |
|
|
|
|
W1 |
W2 |
H |
|
|
|
|
ECT-01 |
13.5 |
9 |
7 |
100 |
|
|
|
|
ECT-02 |
17.5 |
11.5 |
8.3 |
100 |
|
|
|
|
ECT-03 |
19 |
13 |
9.8 |
50 |
|
|
|
|
ECT-04 |
21.7 |
13.5 |
14.8 |
50 |
|
|
|
|
ECT-05 |
25.6 |
12 |
16.8 |
50 |
|
|
|
|
ECT-06 |
27.8 |
11 |
19.5 |
50 |
|
|
|
|
|
|
|
|
|
|
|
| Delivery |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Time: |
15~20 days after received deposit |
|
|
|
|
| Loading Port: |
Shunde |
|
|
|
|
|
|
|
|
|
|
|
|
|
| | |
|